Loading demo links...
What to study for each IASSC-CLL domain
Lean Foundations, Value and Waste
Covers the introduction to Lean including its definitions, benefits, principles and history, and how value is defined from the customer's perspective. It addresses MUDA (waste), MURA (unevenness) and MURI (overburden), the Kano Model of customer satisfaction, Key Performance Indicators, and the teamwork foundations that support improvement.
Key skills
value definition, seven wastes, Muda Mura Muri, Kano categories, leading and lagging KPIs, Lean principles and history
Flow, Pull and Production Leveling
Covers Just-In-Time and pull production, bottleneck analysis, continuous flow, takt time and capacity, layout planning including cellular layouts, SMED changeover reduction, Heijunka level scheduling, and kanban pull systems including kanban sizing.
Key skills
JIT and pull versus push, bottleneck identification, takt time calculation, continuous flow, Heijunka, kanban sizing, SMED internal and external setup, cellular layout
Process Mapping and Workplace Organization
Covers Value Stream Mapping of current and future states, flow (swim-lane) diagrams for cross-functional processes, spaghetti diagrams of physical movement, layout and flow analysis, 5S workplace organisation, visual management, and Overall Equipment Effectiveness and its availability, performance and quality losses.
Key skills
value stream mapping, swim-lane diagrams, spaghetti diagrams, 5S steps and audits, visual management, OEE calculation and loss categories
Built-in Quality and Problem Solving
Covers Jidoka and autonomation, Andon signalling, Poka-Yoke error proofing for prevention and detection, root cause analysis using the 5 Whys and Ishikawa diagrams, risk analysis including FMEA and Risk Priority Numbers, and Standardized Work as the basis for holding quality gains.
Key skills
Jidoka, autonomation, Andon response, poka-yoke prevention and detection, 5 Whys, fishbone diagrams, FMEA and RPN, standardized work elements
Lean Leadership and Daily Management
Covers Gemba and gemba walk behaviour, teamwork and team skills including consensus, brainstorming and empowerment, sustainment of improvement results, Visual Management in daily routines, Short Interval Control and active supervision rituals such as stand-up meetings and shift handovers, and stakeholder management and communication.
Key skills
gemba walks, leader standard work, short interval control, tier meetings, shift handovers, sustainment audits, stakeholder analysis, team empowerment
Kaizen and Improvement Methods
Covers Kaizen as continuous incremental improvement, Kaizen task-force workshops (Kaizen Events or Blitz) run over typically 3 to 5 days, the DMAIC improvement methodology, SMART goal setting, and the PDCA cycle including A3-structured problem solving.
Key skills
kaizen principles, kaizen event structure, DMAIC phases, SMART goals, PDCA cycle, A3 thinking