What to study for each NCP-ARI domain
High-Density Cabling Installation for AI Clusters
Covers hands-on installation of high-density fiber and copper cabling for GPU clusters, including MPO/MTP trunks and polarity, bend radius and pulling practice, DAC and AOC assemblies, and OSFP/QSFP-DD connectivity for InfiniBand and NVLink fabrics. It also addresses connector inspection and cleaning, breakout assemblies, labelling and disciplined in-rack dressing of optical and copper media.
Key skills
Installing MPO/MTP fiber trunks and DAC/AOC copper for GPU clusters, polarity and pin-gender rules, bend-radius discipline, and OSFP/QSFP-DD 400G interconnect practices.
AI Infrastructure Basics for Data Centers
Covers the foundations of AI data-center infrastructure, including the high power density of GPU racks, A/B power distribution, rack PDUs, UPS systems and overhead busway. It also addresses cooling approaches from aisle containment to direct-to-chip liquid cooling, leaf-spine and scale-up versus scale-out fabrics, PUE, structured cabling concepts and environmental monitoring.
Key skills
AI rack power density and A/B power feeds, cooling approaches for GPU racks, InfiniBand and NVLink fabric roles, and data-center tiers and redundancy.
Testing, Verification, and Documentation for AI Cabling
Covers acceptance testing and records for AI cabling, including Tier 1 OLTS loss testing against a calculated loss budget, Tier 2 OTDR event analysis, and copper certification parameters. It also addresses polarity and continuity verification, fabric diagnostic counters, TIA-606-style administration, traceable test records and updating as-built documentation after moves, adds and changes.
Key skills
Tier 1 OLTS loss testing against a loss budget, OTDR traces, copper certification, labelling schemes, and as-built documentation.
Pre-Deployment Planning and Site Assessment for AI Data Centers
Covers assessing a site before an AI deployment, including floor loading, power and cooling capacity headroom, pathway sizing and fill, and delivery-route and clearance checks. It also addresses methods of procedure, measured cable-length planning, bill-of-materials verification and validating the site against the vendor reference architecture for the AI platform.
Key skills
Assessing floor loading, power and cooling headroom, pathway space, delivery routes and staging, and producing a deployment plan and MOP.
Rack Infrastructure Preparation for AI Platforms
Covers preparing racks to receive AI platforms, including positioning, levelling, anchoring and baying racks, bonding each rack to the grounding system, and fitting zero-U PDUs and cable managers before equipment arrives. It also addresses elevation planning with heavy chassis placed low, rail verification for heavy GPU servers and safe handling of doors and side panels during loading.
Key skills
Positioning, levelling, anchoring and baying racks, rail and blanking-panel installation, grounding and bonding, and preparing racks to receive GPU platforms.
Safety, Standards, and Compliance for Data Centers
Covers safe, compliant working in data centres, including the ANSI/TIA-568 and TIA-942 standards families, lockout/tagout, arc-flash PPE selection and ESD protection when handling optics and electronics. It also addresses fiber-shard disposal, LSZH cable requirements, safe lifting of heavy GPU chassis and the legal role of local codes and the authority having jurisdiction.
Key skills
ANSI/TIA-568 and TIA-942 standards, lockout/tagout, arc-flash and ESD precautions, LSZH cable requirements, and PPE for installation work.
Cable Support Systems and Weight Management
Covers the support systems that carry AI cabling, including ladder rack and cable tray load ratings, fill and weight calculations where copper bundles dominate loading, and structural attachment of pathway supports. It also addresses J-hook spacing and bundle limits, and treating in-rack cable managers as finite pathways whose capacity and bend control must be planned.
Key skills
Ladder rack and cable tray load ratings, fill calculations, J-hooks and support spacing, and managing cable weight in high-density pathways.