PVDS PV Design Specialist — Exam Overview
Quick Facts
PVDS — PV Design Specialist (PVDS) Board Certification — is a NABCEP (North American Board of Certified Energy Practitioners) credential examined against the Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS. Domains and owner weights: Review customer expectations (12%); Review project criteria (12%); Assess project site (15%); Configure mechanical design (13%); Configure electrical design (17%); Configure system monitoring, control, and communications design (7%); Prepare project documentation (8%); Secure permits and approvals (8%); Adapt system design (8%). Electrical design carries the largest weight (17%), followed by site assessment (15%) and mechanical design (13%). Owner fees: Application $125 / Exam $375 / Re-exam $275 / Recertification $390 (NABCEP Fees page). NABCEP does not publish a pass mark for this credential in its JTA; none is asserted here. This Study4Pass practice bank contains 80 original practice questions aligned to that blueprint.
Who this exam is for
Experienced PV designers who configure residential and commercial systems — customer requirements, code criteria, site assessment, mechanical and electrical design, monitoring design, documentation, permitting and design adaptation — and are preparing for the NABCEP PV Design Specialist (PVDS) Board Certification.
Exam Domains
Review customer expectations — 12%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering translating what the customer wants — offset goals, budget, aesthetics and backup expectations — into documented, realistic design inputs. Owner weight: 12%. Key skills: Customer goals and constraints; Bill and tariff analysis; Backup expectations; Production-estimate basis; Documented scope decisions.
Review project criteria — 12%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering establishing the binding code, structural, fire and utility criteria the design must satisfy before layout begins. Owner weight: 12%. Key skills: Adopted NEC edition and Article 690/705 criteria; Busbar 120% rule; Structural and fire-setback criteria; Utility export limits.
Assess project site — 15%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering measuring the physical site — solar access, shading, roof condition, service equipment and access — that the design stands on. Owner weight: 15%. Key skills: Shade and solar-access measurement (TSRF); Roof condition and remaining life; Service capacity; Site hazards and access.
Configure mechanical design — 13%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering engineering the mounting system: attachments, racking, load paths and weather sealing for the chosen structure. Owner weight: 13%. Key skills: Racking and attachment engineering; Flashing and weather sealing; Ballasted and ground-mount structures; Clamp zones and torque.
Configure electrical design — 17%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering the electrical core of the design: string configuration, conductor and protection sizing, inverter matching and interconnection. Owner weight: 17%. Key skills: String sizing and temperature-corrected Voc; Conductor and overcurrent sizing; Inverter/MPPT matching; Interconnection method.
Configure system monitoring, control, and communications design — 7%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering designing how the system will be metered, monitored and controlled, including export limiting where required. Owner weight: 7%. Key skills: Production and consumption metering; Communications paths; Export/power control; Performance references and alarms.
Prepare project documentation — 8%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering producing the documentation package — plan sets, diagrams, calculations and handover records — that permits and construction rely on. Owner weight: 8%. Key skills: Permit plan sets; Single-line diagrams; Calculations and datasheets; Labels, as-builts and owner manuals.
Secure permits and approvals — 8%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering moving the design through AHJ permitting, utility interconnection and any additional approvals to permission to operate. Owner weight: 8%. Key skills: AHJ permits and corrections; Utility interconnection and PTO; HOA and historic approvals; Adopted-code compliance.
Adapt system design — 8%
One of the 9 domains in the owner blueprint for the PVDS examination (Photovoltaic Specialists: Job Task Analysis (September 2017, V. 02.21) — the combined Specialist JTA published by NABCEP for PVDS, PVIS and PVCMS), covering revising the design when equipment, site conditions or approvals change, keeping calculations and documents consistent. Owner weight: 8%. Key skills: Equipment substitutions; Field-condition changes; Capacity changes and expansions; Value-engineering limits.
Preparing for PVDS
Work through the practice questions in study mode first, read every explanation, then switch to timed practice. Weight your revision by the domain weightings above and revisit the topics you score lowest on until your practice scores are consistent.
Write Your Review on PVDS PV Design Specialist
PVDS Customer Reviews
No reviews yet
Be the first to share your experience with this exam.