What to study for each ISA-CAP domain
Feasibility Study
Covers identifying, scoping and justifying the automation project at concept stage. It includes the business case, project charter, preliminary scope and boundaries, and cost-benefit and risk assessment before major capital is committed.
Key skills
Business case and cost-benefit analysis, project charter, preliminary scope and exclusions, order-of-magnitude estimating, concept-stage risk assessment, and stakeholder identification.
Definition
Covers identifying customer requirements and completing a high-level analysis of the best way to meet them. It includes user and functional requirements, conceptual design options, the design basis and philosophies, and selection of applicable standards.
Key skills
User requirements specification, functional requirements and traceability, conceptual options evaluation, control and alarm philosophies, standards selection including IEC 61511, and requirements baselining and change control.
System Design
Covers preparing the complete conceptual design of the control and information systems, including specifications of hardware and software, and completing the detail design and procurement of hardware systems including construction work packages. It spans P&IDs, control narratives, I/O lists, network architecture, HMI design and instrument specification.
Key skills
P&IDs and control narratives, I/O lists and instrument datasheets, control network architecture and the Purdue model, high-performance HMI design per ISA 101, SIS and BPCS independence and cause-and-effect design, and hardware procurement and construction work packages.
Development
Covers identifying, developing and implementing requirements for software configuration and development. It includes control software built to configuration standards, use of simulation, interface and integration testing, and factory acceptance testing against the approved design.
Key skills
Configuration standards and standard libraries, control software development, dynamic simulation, graphics development, defect management and regression testing, factory acceptance testing, and version control and verified backups.
Deployment
Covers developing, reviewing and executing all phases of project field installation, testing and start-up. It includes installation verification, loop checks, site acceptance testing, commissioning, pre-startup safety review and handover to operations.
Key skills
Installation inspection, point-to-point loop checking, site acceptance testing, cold and hot commissioning, punch list management, calibration verification, pre-startup safety review, and start-up and turnover.
Operation and Maintenance
Covers preparing and implementing the lifecycle strategy for a project after handover. It includes maintenance strategy, critical spares, documentation handover and as-built control, management of change, lifecycle support, proof testing and obsolescence management.
Key skills
Preventive and predictive maintenance, critical spares strategy, management of change, SIS proof testing and bypass control, alarm performance monitoring, backup and restore verification, and obsolescence and lifecycle planning.