Loading demo links...
What to study for each M1 domain
General Administration
Domain 01 of ICC's content outline for the M1 examination (m1_content.pdf), covering project administration - approved plans, valid permits and approved products installed per their listing - public information and legal duties, and verification that the manufacturer's installation instructions and the listing of the equipment have been followed.
Key skills
Project Administration; Public Information and Legal; Manufacturer's Installation Instructions
Heating/Cooling/Water Heaters
Domain 02 of ICC's content outline for the M1 examination, covering heating equipment, water heaters and boilers, cooling and refrigeration, and other fuel-burning systems, each verified against the code, the manufacturer's instructions and the equipment listing, with proper access, clearances, supply and return air and duct connections.
Key skills
Heating Equipment; Water Heaters and Boilers; Cooling and Refrigeration; Other Systems
Exhaust and Ventilation Systems
Domain 03 of ICC's content outline for the M1 examination, covering exhaust fans and kitchen range hoods with required mechanical ventilation, and clothes dryer exhaust duct installations.
Key skills
Exhausts, Fans, and Kitchen Range Hoods; Clothes Dryer Exhaust
Duct Systems
Domain 04 of ICC's content outline for the M1 examination, covering duct construction and installation - acceptable materials, support and insulation - and correct use and application of ducts and plenums, including sizing of supply and return air ducts.
Key skills
Duct Construction and Installation; Duct and Plenum Use and Application
Combustion Air
Domain 05 of ICC's content outline for the M1 examination, covering proper sources of air supply for fuel-burning appliances and the size and location of openings, and the materials and installation of combustion air ducts.
Key skills
Combustion Air (sources, openings, ducts)
Chimneys and Vents
Domain 06 of ICC's content outline for the M1 examination, covering venting of fuel-burning appliances - size, type, location, clearances, connections and terminations - chimney and vent connectors, factory-built chimneys and fireplaces, and masonry chimneys and fireplaces.
Key skills
Venting of Fuel-Burning Appliances; Chimney and Vent Connectors; Factory-Built Chimneys and Fireplaces; Masonry Chimneys and Fireplaces
Fuel Supply Systems
Domain 07 of ICC's content outline for the M1 examination, covering gas piping installation, sizing, materials and supports with testing for tightness, fittings, valves, connections and material transitions, and oil piping and storage.
Key skills
Fuel Supply Installation and Sizing; Fuel System Connections; Oil Piping and Storage