CCM-100 Certified Construction Manager — Exam Overview
Quick Facts
The GAQM Certified Construction Manager (CCM-100) validates construction management skills across project fundamentals, planning, cost, scheduling, quality, safety and environment, contracts and procurement, risk and legal aspects, and leadership through closeout. The real exam has 100 multiple-choice questions in 2 hours (120 minutes), with a passing score of 70%. It is AI-proctored and can be taken anytime within an eight-month voucher validity period; the voucher covers 2 attempts. The certificate is valid for life, and there are no prerequisites.
Who this exam is for
Construction managers, project managers, site managers, and construction professionals who plan, coordinate, and control building projects and want to validate construction management competence.
Exam Domains
Fundamentals of Construction Management
Covers the role of the construction manager, project delivery methods including design-bid-build, design-build, and construction manager at risk, the scope-time-cost balance, preconstruction services, coordination among owner, architect, and contractor, project phases, and requests for information.
Construction Project Planning
Covers the work breakdown structure, site investigation, constructability reviews, long-lead procurement planning, scope statements, logical activity dependencies, value engineering, permit constraints in the plan, and the integrated project plan.
Cost Management and Estimation
Covers estimate types from order-of-magnitude to detailed quantity-based estimates, quantity takeoff, contingency, escalation allowances, earned value and cost performance index, change order costing, and checking abnormally low bids.
Construction Scheduling and Control
Covers the critical path method, total float, Gantt charts, milestones, lags and dependencies, schedule recovery by crashing and fast-tracking, progress updates and forecasting, and resource levelling.
Quality Management in Construction
Covers quality assurance versus quality control, punch lists, nonconformance reporting for failed tests, submittal review, root cause analysis of repeated defects, quality plans, mock-ups and benchmarks, and inspection of work before it is covered.
Safety, Health, and Environmental Management
Covers job hazard analysis, fall protection, toolbox talks, recording incidents and near misses, erosion and runoff controls, site safety plans, mandatory personal protective equipment, safe crane lifting, and proactive safety inspections.
Contract and Procurement Management
Covers lump sum and unit price contracts, guaranteed maximum price, retainage, written notice for changes and claims, competitive bidding, subcontractor prequalification, expediting late deliveries, and progress payment applications.
Risk Management and Legal Aspects
Covers the risk register, risk transfer through insurance, differing site conditions, permits and code compliance, dispute resolution before litigation, liquidated damages, mechanic's liens, risk avoidance and acceptance, and certificates of occupancy.
Leadership, Communication, and Project Closeout
Covers resolving subcontractor conflict, meeting minutes, closeout documents including as-built drawings, manuals, and warranties, substantial completion, honest delay reporting, lessons learned, final acceptance, team motivation, defects liability, and progress reporting.
Preparing for CCM-100
Work through the practice questions in study mode first, read every explanation, then switch to timed practice. Weight your revision by the domain weightings above and revisit the topics you score lowest on until your practice scores are consistent.
Write Your Review on CCM-100 Certified Construction Manager
CCM-100 Customer Reviews
No reviews yet
Be the first to share your experience with this exam.