ICGB IASSC Certified Lean Six Sigma Green Belt

Loading demo links...

Showing 1–3 of 10 questions

Question 1

Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).

Select all that apply, then click Submit answer.

  • Non-linear relationships between the inputs X’s and output Y

  • Uncertainty in the slope of the linear relationship between an X and a Y

  • Relationships between Y (output) and more than one X (Input)

  • Preventing the use of a Designed Experiment if unnecessary

  • We assume that the X’s are independent of each other

Question 2

Which statement(s) are correct for the Regression Analysis shown here? (Note: There are 2 correct answers).

Select all that apply, then click Submit answer.

  • This Regression is an example of a Multiple Linear Regression.

  • This Regression is an example of Cubic Regression.

  • %Cu explains the majority of the process variance in heat flux.

  • Thickness explains over 80% of the process variance in heat flux.

  • The number of Residuals in this Regression Analysis is 26.

Question 3

Examples of a Visual Factory include which of these? (Note: There are 2 correct answers).

Select all that apply, then click Submit answer.

  • White outlines on floor for proper inventory placement

  • Documented procedures with a numerical outline

  • Bad/Good indications of gauge readings with red and green outlines

  • Implementing a defect inspection device