Question 10 (Mixed Questions)

A customer produces light projection toys for holiday decorations throughout the year.

You are in the first month of a season. Production flows take one day to complete.

The floor supervisor reports that seasonal production targets will not be met. You review the Kanban schedule board and identify thousands of unplanned jobs.

You need to plan the jobs to be completed two weeks prior to the start of the next season.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Select all that apply, then click Submit answer.

  • Set the Automatic planning option for each unscheduled job to Yes

  • Manually schedule each unscheduled job on its due date

  • Set the Automatic planning option for each unscheduled job to No

  • Manually schedule each unscheduled job forward from the date of the end of the season

  • Manually schedule each unscheduled job to the next period of the start of the next season

  • Manually schedule each unscheduled job to the previous period of the end of the next season

Question 11 (Mixed Questions)

You have a product that can be manufactured on two different production lines in the same warehouse. You create resources and then create individual input locations for the resources. You create two routes. Each route uses different resources.

Materials are staged for consumption in different locations based on the resources being utilized for production.

You need to set up the formula to consume the goods from the correct line-side location.

What should you do?

Select an option, then click Submit answer.

  • Select a warehouse and consumption operation for each line.

  • Select resource consumption and the operation for each line.

  • Select the plan group and consumption operation for each line.

  • Specify a site in the formula header.

Question 12 (New Update)

You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:

• The setup uses a Lean schedule group with a throughput ratio = 2.

• The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.

• The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).

• The throughput is 10 per hour.

You need to set up a Discrete operation to mirror the item's production flow activity.

Select an option, then click Submit answer.

  • Create a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 0.0167 (e.g. 1 hour/ 60 minutes).

  • Create a route with a runtime = 1, a process quantity = 10, and the operation's "hours/time = 1.

  • Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1.

  • Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.