Question 7 (New Update)

You are the production supervisor at a chemical processing plant. You must track attributes for each batch of

chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as

finished.

You need to ensure that the values of attributes are updated and tracked.

What three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Select all that apply, then click Submit answer.

  • Assign the attributes to the chemicals

  • Assign the attributes to the appropriate test on the test group

  • Create attribute types

  • Set up batch attributes

  • Create a test instrument for each attribute

Question 8 (Case Study 2)

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Select all that apply, then click Submit answer.

  • unmachined plastic pieces

  • mold tooling

  • machined plastic pieces

  • excess plastic

Question 9 (Mixed Questions)

You are a production manager at a company which produces large batches of coffee and creamers.

After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.

You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.

What three actions are required on the rework order? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Select all that apply, then click Submit answer.

  • Delete all items from the production formula except for 20 grams of sugar

  • Add 20 grams of sugar to the production formula

  • Delete all route operations except for a half an hour stirring operation

  • Manually reserve batch 120008 after estimating the batch order

  • Add a route operation for 0.5 run time hours of stirring