A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)
Select all that apply, then click Submit answer.
-
○
Use a battery pack to power APs.
-
○
Use a drawing of the office space to draw AP and client placements.
-
○
Use DoS attack on APs while measuring the throughput.
-
○
Use APs with directional antennas.
-
○
Use APs with external antennas.
-
○
Use APs with built-in antennas.