What to study for each IDIX domain
Codes and Life Safety
Egress requirements (number of exits, occupant load, travel distance, common path, exit separation and signage), fire-resistance ratings for corridors, partitions and door assemblies, interior finish flame spread and smoke development classes, safety glazing in hazardous locations, accessibility requirements for fixtures, handrails and clearances, and fireblocking and draftstopping — applied with the health, safety, and welfare emphasis that governs the IDIX exam.
Key skills
Occupant load and exit counts; travel distance and common path; corridor and door fire ratings; finish flame spread classes; safety glazing; accessible fixture and handrail requirements; fireblocking and draftstopping
Integration and FF&E
Integrating furniture, fixtures and equipment with building systems: coordinating power and data with fixed and systems furniture, lighting layouts on the reflected ceiling plan, plumbing fixtures with accessible clearances, operable partitions with structure and acoustics, window treatments with pockets and motorization, signage with accessibility requirements, appliance services in kitchenettes, and flammability and life-safety checks on FF&E selections.
Key skills
Power/data coordination with FF&E; ceiling and lighting integration; accessible plumbing fixture integration; operable partitions; window treatment provisions; accessible signage; appliance service coordination; FF&E flammability compliance
Construction Documents
Producing a complete, coordinated construction document set: floor plans as the key reference, partition types and tags, reflected ceiling plans, interior elevations, sections and enlarged plans, details and scales, dimensioning conventions, door/finish/fixture schedules that agree with the plans, keynotes and legends, demolition versus new-work scope, graphic scales, title block and revision control, and shop drawing review — the largest domain, reflecting the IDIX focus on the construction documentation phase.
Key skills
Floor plan coordination; partition types; reflected ceiling plans; elevations, sections and details; dimensioning conventions; schedule accuracy; keynotes and legends; demolition/new work scope; document control and revisions; submittal review
Consultant Drawing Coordination
Coordinating the interior documents with consultant drawings: structural support for openings and heavy elements, mechanical duct clearances versus ceiling heights, a single shared lighting fixture schedule, AV and security rough-in, plumbing relocations, food-service equipment requirements, sprinkler coverage versus ceiling design, acoustic assembly changes, site finished-floor levels, and version control of shared background files.
Key skills
Structural coordination; mechanical clearances; shared fixture schedules; AV/security rough-in; plumbing coordination; equipment service requirements; sprinkler coordination; background file version control
Construction Specifications and Schedules
Specifying the work with MasterFormat: Division 01 general requirements versus technical sections, performance, reference, descriptive and proprietary specification methods and substitutions, finish legends and schedules, door hardware sets, equipment schedules carrying MEP service data, FF&E specifications tied to the furniture plan, and reconciling schedules, legends and specifications before bidding.
Key skills
MasterFormat organization; Division 01 vs technical sections; specification methods; finish legends and schedules; hardware sets; equipment schedules; FF&E specifications; pre-bid reconciliation