DCDC-004 Data Center Design Consultant (DCDC) — Exam Overview
Quick Facts
The DCDC-004 Data Center Design Consultant (DCDC) exam from BICSI is a computer-based exam with 100 questions to be answered in 2 hours, including multiple-choice questions with two correct answers, drag-and-drop items, and hot-spot items. The exam application fee is $510 for BICSI members and $725 for nonmembers, the references are ANSI/BICSI 002-2024 and Essentials of Data Center Projects, 2nd edition, and BICSI does not publish a fixed passing percentage because the passing score is set by standard-setting using the Angoff method. The credential is renewable on a 3-year cycle requiring 36 CECs.
Who this exam is for
Data center designers and consultants, ICT designers, engineers, and project professionals who plan, design, assess, and commission data center facilities should take this exam.
Exam Domains
Concept Planning & Analysis — 30%
This section covers defining business and IT requirements, capacity and growth planning, and selecting an availability class for the facility. It also covers site selection, risk analysis, and the conceptual planning decisions that set the scope and budget for the design.
Architectural, Mechanical and Electrical Systems — 20%
This section covers architectural and space design together with the mechanical and electrical systems that support the IT load. It also covers power distribution and cooling design choices that determine capacity, redundancy, and maintainability.
IT, Ancillary Systems and Communications Connectivity — 20%
This section covers information technology systems together with ancillary systems and the communications connectivity that links them. It also covers structured cabling spaces and pathways, diverse entrances, and the integration of monitoring and control systems.
Data Center Operations and Maintenance Assessment — 10%
This section covers assessing how a data center is operated, including staffing, procedures, training, and documentation. It also covers evaluating maintenance programmes, spare parts, and change control for their effect on reliability.
Security Assessment — 10%
This section covers assessing physical security threats, vulnerabilities, and the layered controls that protect a data center. It also covers perimeter, access control, surveillance, and visitor management measures and how gaps in them are identified.
Construction Administration & Commissioning — 10%
This section covers administering construction, including submittal review, site observation, and handling changes and deficiencies. It also covers the commissioning process from factory testing through functional and integrated systems testing.
Preparing for DCDC-004
Work through the practice questions in study mode first, read every explanation, then switch to timed practice. Weight your revision by the domain weightings above and revisit the topics you score lowest on until your practice scores are consistent.