5V0-31.20 VMware Cloud Foundation Specialist

Loading demo links...

Showing 4–6 of 10 questions

Question 4

An architect has been tasked with designing a stretched workload domain between two sites in an active configuration due to number of recent failures in the company’s infrastructure.

Which three consideration apply to the design? (Choose three)

Select all that apply, then click Submit answer.

  • vSAN Witness Appliance can be deployed in VMware Cloud on AWS

  • The witness appliance should be running different version of fc:SXi as the ESXi hosts in the stretched cluster.

  • Static routes on the vSAN Witness host must be configured to enable network communication for the vSAN kernel traffic.

  • The management domain cluster must be stretched before stretching a cluster in a VI workload domain.

  • First cluster only in every VI workload domain can be stretched.

  • The vSAN Witness Appliance must be available on the same broadcast domain

Question 5

Which two actions are prerequisites for upgrading VMware Cloud Foundation 4 x? (Choose two.)

Select all that apply, then click Submit answer.

  • Validate that all required bundles for the upgrade are downloaded successfully.

  • Acquire a temp IP range for the new products components deployed during the upgrade

  • Take a backup of SDDC Manager

  • Take a snapshot of all workloads running on VMware Cloud foundation

  • Validate that all required license keys are available for the newer products versions

Question 6

An administrator has been tasked with increasing the available capacity within an existing Cloud Foundation deployment to support the deployment of a production Workload Management cluster.

The VMware Cloud Foundation environment consists of a single workload called Production. The Production workload domain consists of a single vSAN Cluster called Production-01 that existing Virtual Machines. During the original deployment, even through automated firmware updates were not required, the Production workload domain was configured to use vSphere Lifecycle Images to automate its ongoing lifecycle management.

Four new hosts have been commissioned in SDDC Manager to support Workload Management. The new hosts are identically configured to the hosts that are currently deployed into the Production-01 cluster.

Which process must the administrator complete to enable Workload Management?

Select an option, then click Submit answer.

  • Create a new vSAN Cluster within a new vSphere Lifecycle Manager Image-based workload domain.

  • Create a new vSAN Cluster within a new vSphere Lifecycle Manager Baseline-based workload domain.

  • Extend the Production-01 vSAN cluster with the additional four hosts.

  • Create a new vSAN Cluster within the Production workload domain