VMCE_v12 Veeam Certified Engineer v12

Loading demo links...

Showing 7–9 of 10 questions

Question 7

A physical Windows server protected by a centrally managed Veeam agent is physically damaged.A Hyper-V infrastructure is available, and the physical server is eligible for virtualization.Which recovery step provides the lowest possible RTO?

Select an option, then click Submit answer.

  • Use Export Disk Content as Virtual Disk to create a new VM.
  • Use Instant VM Recovery to Hyper-V.
  • Use Instant Disk Recovery to Hyper-V.
  • Use Bare Metal Restore to Hyper-V VMs.
Question 8

Veeam Backup & Replication is currently configured to back up different workloads: Linux physical computers and Windows physical computers.A second copy of all the backups including transaction logs must be created.Which job configuration is correct?

Select an option, then click Submit answer.

  • Two "periodic copy" backup copy jobs
  • A single "immediate copy" backup copy job
  • Two "immediate copy" backup copy jobs
  • A single "Periodic copy" backup copy job
Question 9

An administrator is asked to change a backup copy job from periodic mode to immediate mode.How can this be accomplished?

Select an option, then click Submit answer.

  • Modify the job settings on the proxy performing the copy job.
  • Enable immediate mode on the repository.
  • Edit the original job and select immediate copy mode from the job settings.
  • Create a new copy job and delete the original job.