VMCE_V9 VEEAM Certified Engineer (VMCE9)

Loading demo links...

Showing 4–6 of 15 questions

Question 4

It was decided to set up Veeam Backup & Replication to ensure parallel tasks do not impact production storage availability. Which parameters should be adjusted in the I/O Control section of the menu to do this? (Choose two.)

Select all that apply, then click Submit answer.

  • Throttle I/O of existing tasks at:

  • Turn off parallel processing at:

  • Stop assigning new tasks to datastore at:

  • Stop processing until the latencyis lower than:

Question 5

A Backup Administrator configures a backup copy job containing several VMs each of which are backed up by different daily jobs. How many backup files will be created as the result of the initial successful run of the backup copy job? (Choose two.)

Select all that apply, then click Submit answer.

  • One backup file per one VM

  • One backup file

  • One backup file per each VM multiplied by the number of existing restore points for the daily backup jobs

  • It is impossible to create a backup copy job for this setup

  • One backup file per each existing restore point of the daily backup jobs

Question 6

Which recovery verification tests can be executed when verifying both backups and replicas? (Choose three.)

Select all that apply, then click Submit answer.

  • CRC check

  • Heartbeat test

  • Application test

  • Ping test

  • Hardware test