OMG-OCSMP-MBA400 OMG-Certified Systems Modeling Professional - Model Builder - Advanced

Loading demo links...

Showing 1–3 of 10 questions

Question 1

Choose the correct answer.

An engineering learn has been charged to design and build an embedded real-time control system using COTS (Commercial Off-The-Shelf) purchased components where possible A technical risk for such a control system is that the system will miss (i.e . fail to respond to) critical inputs The project has the additional risk that there may not be any components on the market that will meet both timing and cost constraints

Given this, what information must be in the model before the engineering team can begin selecting and procuring COTS components?

Select an option, then click Submit answer.

  • timing constraints for all behaviors involved in responding to a critical input

  • (1) liming constraints for all behaviors involved in responding to a critical input (2) total system production cost provided by the customer

  • (1) minimum period of time between any two successive critical inputs
    (2) maximum acceptable time to produce all outputs for a critical input
    (3) allocation of (2) to all behaviors involved in responding to a critical input
    (4) total system production cost provided by the customer

  • (1) minimum period of time between any two successive critical inputs
    (2) maximum acceptable time to produce ail outputs for a critical input
    (3) allocation of (2) to all behaviors involved in responding to a critical input
    (4) total system production cost provided by the customer
    (5) allocation of (4) to system components

  • (1) minimum period of time between any two successive critical inputs
    (2) maximum number of critical inputs that will arrive in a given time interval
    (3) maximum acceptable time to produce all outputs for a critical input
    (4) allocation of (3) to all behaviors involved in responding to a critical input
    (5) total system production cost provided by the customer
    (6) allocation of (5) to system components

Question 2

Choose the correct answer

A system modeler exports requirements from a requirements management tool into a spreadsheet and then imports the requirements into a system modeling tool.

Which type of data exchange is this considered?

Select an option, then click Submit answer.

  • manual exchange

  • file-based exchange

  • interaction-based exchange

  • repository-based exchange

Question 3

Choose the correct answer.

Which element would be used to depict a model library on a diagram?

A)

B)

C)

D)

Select an option, then click Submit answer.

  • Option

  • Option

  • Option

  • Option