NCM-MCI Nutanix Certified Master

Loading demo links...

Showing 1–3 of 10 questions

Question 1

HOTSPOT

A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.

Which steps should the administrator perform next?

Hot Area:

Answer is in the explanation below.

Question 2

An administrator responsible for a VDI environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDI VMs.

What are two impacts on the cluster? (Choose two.)

Select all that apply, then click Submit answer.

  • Increase CPU utilization %

  • Increase CPU ready %

  • Increase memory utilization %

  • Increasing CPU counts will decrease memory utilization

Question 3

A VDI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (Bridge0). The administrator needs to verify if nodes are using all network cards associated to Bridge0.

Which two menus should be used to check the current configuration? (Choose two.)

Select all that apply, then click Submit answer.

  • Host NICs tab in Hardware menu

  • I/O Metrics tab in VM menu

  • Host view in Network menu

  • Network Configuration item in Settings menu