MB-335 Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert

Loading demo links...

Showing 4–6 of 10 questions

Question 4 (Adatum Corporation)

HOTSPOT

You need to determine the batch values on the combined mix batches for OperatorA. Which values should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

Answer is in the explanation below.

Question 5 (Adatum Corporation)

A company produces homeopathic lotions for pain relief. The lotions use a combination of ProductA and ProductB. ProductA is the primary ingredient. You use Products to adjust the concentration of active ingredients in the lotion. ProductC represents the remainder.

You need to ensure that the lotion final product has a consistent concentration of anti-inflammatory agents.

Which two actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.

Select all that apply, then click Submit answer.

  • Set the formula line type of ProductB to Active

  • Set the formula line type of ProductA to Compensating

  • Set the formula line type of ProductC to None

  • Set the formula line type of ProductA to Active.

  • Set the formula line type of ProductB to Compensating

Question 6 (CASE STUDY 1 Manufacturing Company General information)

You need to plan scheduling for Customer1s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.

Select all that apply, then click Submit answer.

  • Schedule production based on the availability of raw material.
    In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.

  • Split and plan operations in detail for each of the resources.
    The company is manually calculating an 8% overhead on materials and posting a journal manually.



  • Schedule productions based on the capacity of the resources.

  • Run master planning with a specific time fence.

  • Plan scheduling of the production at the resource group level.