CTAL-TTA ISTQB Certified Tester Advanced Level - Technical Test Analyst

Loading demo links...

Showing 4–6 of 10 questions

Question 4 (Testing of Software Characteristics)

It has been decided by management to ask an external consultant to perform a reliability assessment. The external consultant will use a checklist to support the assessment. Select TWO checklist items that are most likely to be part of a reliability checklist. 2 credits [K3]

Number of correct answers: 2

Select all that apply, then click Submit answer.

  • Are traceability matrices provided to the requirements?

  • Is all code supported by a reviewed design document?

  • Is the comment frequency at the correct level?

  • Is a dual set of hardware available?

  • Are features available for a periodic check of the database consistency?

Question 5 (Test Process & Incident Management)

Exhibit:

Identify TWO main advantages of this approach to incident management. (3 credits, for 1 out of 2 correct 1 credit) 3 credits [K4]

Number of correct answers: 2

Select all that apply, then click Submit answer.

  • Quick to set up and cheap

  • Electronic rather than manual

  • Allows attachments (e.g. screen prints) to be linked to the incident reports

  • Can easily be integrated with open source tools

  • Large files are not a problem

Question 6 (Structure-based Techniques)

Which specification-based technique could be used to enhance coverage for this code fragment?              1 credit [K2]

Number of correct answers: 1

Select an option, then click Submit answer.

  • Boundary value analysis

  • Exploratory testing

  • State transition testing

  • Use case testing