L1 layer of the teaching center to deepen the design goal O (multiple choice)
Select all that apply, then click Submit answer.
-
○
On the 54 of the design bidding plan), further clarify the main request, refine the design plan and BOQ, and the design depth meets the construction drawing standard;
-
○
daphne interface, to ensure that the design and construction of the various subsystems of the project, K, structure, water, electricity, HVAC, decoration and other special design to maintain a high degree of consistency and coordination; | correct bitter case
-
○
rovides technical support for the installation of $ bit (subcontracting construction unit), equipment supplier g project acceptance; ( > P
-
○
The actual situation of the end of the platform, the Huawei (including the third party outside and choose
«, the sub-contractor customer's job responsibility interface to go ^ clear the project's SOW (work and sleep) and support to determine RM2