H13-629_V2.0 HCIE-Storage (Written) V2.0

Loading demo links...

Showing 4–6 of 15 questions

Question 4 (Exam Pool C)

Due to business needs, when a reboot operation is performed on a VTL6900 (including the VTL engine, SIR engine, storage unit, and optical switch) whichdescription is correct? (Multiple choice)

Select all that apply, then click Submit answer.

  • Power off the VTL6900 as a whole without any special requirements

  • Restart the device according to the following restart sequence:VTL engine restartedSIR engine restartFiber Channel switch and storage unit restart

  • restart the device as follows to restart the device:SIR engine restartVTL engine restartedFiber Channel switch and storage unit restart

  • If the VTL engine is configured for A and B two-node clusters, suspend the VTL failover and then restart theVTL engines A and B in turnAfter all the two nodes of A and B are normally started, restore the VTL failover

Question 5 (Exam Pool C)

A customer RAID 5 fails in the OceanStor v3 storage array. After the engineer reclaims the RAID group tothe degraded state through commands, the RAID group tries to rebuild, but reconstruction failed many times, which of the following is correct (multiple choice).

Select all that apply, then click Submit answer.

  • Recovery of the RAID group can be done by recovering the first failed hard disk

  • Recoveryof the RAID group can not be done by recovering the first failed hard disk

  • Recovery of the Raid group by recovering the first failed hard disk, the recovered data will be lost for a period of time

  • Recovering the Raid Group by Recovering the First Erased Hard Disk, the recovered data is not available


Question 6 (Exam Pool C)

When designing SQL server database disaster recovery, the calculation of disaster recovery capacity must consider which of the following file size? (multiple choice)

Select all that apply, then click Submit answer.

  • control file

  • data file

  • log file

  • configuration file