Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb F8 modules.
The customer wants to:
What are the basic steps to add the second frame? (Choose three.)
Select all that apply, then click Submit answer.
-
○
Move the standby composer to the second frame.
-
○
Disconnect the existing management ring, and then cable the FLM (frame link module) in the first frame to the FLMs in the second frame.
-
○
Install a satellite module in the first frame.
-
○
Move the bottom VC module from the first frame to the second.
-
○
Move one of the uplinks from the FLM in the first frame to a FLM in the second.