Question 4

A customer needs increased available bandwidth and highly available network between Virtual Connect Interconnects.

Which two steps must the Synergy integrator perform in the configuration to meet the customer needs? (Select two.)

Select all that apply, then click Submit answer.

  • Link Ports L1 and L4 on Master LCMs to port L1 and L2 on the first Satellite ICM.

  • Install Redundant Frame Link Modules and a second management ring.

  • Enable Multimode Link Aggregation Group (MLAG).

  • Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.

  • Connect ports Q7 and Q8 master interconnect Modules (ICM).

Question 5

When should IP address be assigned using an IPv6 address pool in the Composer? (Select two.)

Select all that apply, then click Submit answer.

  • when configuring management NICs in an operating system

  • when booting to an iSCSI initiator with image Streamer

  • when PXE booting from the deployment server

  • when configuration Composer appliance

  • when configuration interconnects modules

Question 6

A Synergy Integrator is configuring an HPE Synergy environment with two HPE Connect 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches and needs all compute modules to share the full 160Gb of available bandwidth. The upstream are interconnected in a virtual port channel (vPC) pair.

What should the integrator do to ensure that the switch configuration doe not result in a network loop?

Select an option, then click Submit answer.

  • Cross Connect the Volume Connect modules to the upstream switch and select all four 40Gb ports for the uplink Virtual Connect will automatically configure the Multiple Link Aggregation Group. (MLAG).

  • Create two separate Virtual Connect uplinks Select two ports from each module fro each uplink. Configure spanning three protocol (STP) on both Virtual Connect uplinks to default port forward mode.

  • Cross connect the Virtual Connect modules to the upstream switches and select all four 40Gb ports for the uplink Configure spanning tree protocol (STP) on the Virtual Connect uplink to default to port forward mode.

  • Create two separate Virtual Connect uplinks. Select one part from each module for each uplink. Use two separate Logical Interconnect Group (LIGs) to keep the uplinks from looping.