Which three steps should be performed during a new VSP installation? (Choose three.)
Select all that apply, then click Submit answer.
-
○
Install HiTrack Monitor on a customer server and configure it.
-
○
Set the battery date for each battery.
-
○
Install all SSVP jumpers.
-
○
Connect the CE laptop to the Console LAN connection port on the SVP.
-
○
Dump the final configuration and upload it to TUF.