DRAG DROP

Refer to the exhibit. Drag and drop the EVC configuration items from the left onto the correct descriptions on the right.
Select and Place:

Answer is in the explanation below.
Loading demo links...
Showing 1–3 of 10 questions
DRAG DROP

Refer to the exhibit. Drag and drop the EVC configuration items from the left onto the correct descriptions on the right.
Select and Place:

Answer is in the explanation below.

Refer to the exhibit. A network engineer has been called to configure the four PE devices in order to enable full communication among the four CE devices connected to them. While starting to configure, he experienced a connectivity issue. Which two tasks should the engineer perform in order to begin the process correctly? (Choose two.)
Select all that apply, then click Submit answer.
Configure PE3 to export route-targets 100:1 and 200:2.
Configure PE3 to import route-targets 100:1 and 200:2.
Configure PE4 to import route-targets 101:1 and 202:2.
Configure PE2 to export route-targets 300:3 and 400:4.
Configure PE1 to import route-targets 300:3 and 400:4.
While troubleshooting EoMPLS configuration problems, which three parameters should an engineer match between the two ends of the pseudowire configurations? (Choose three.)
Select all that apply, then click Submit answer.
VLAN name
Xconnect group name
EFP subinterface number
pseudowire ID
MTU size
control word usage