TTA1 ISTQB-BCS Certified Tester Advanced Level- Technical Test Analyst (2012)

Loading demo links...

Showing 1–3 of 10 questions

Question 1 (Test Process & Incident Management)

Which TWO of the following artefacts can be useful as a test oracle the first time a test case is run? 1 credit [K2]

Number of correct answers: 2

Select all that apply, then click Submit answer.

  • Incident report

  • Requirements Specification

  • Test summary report

  • Legacy system

  • Test plan

Question 2 (Bonus Program)

To support code reviews a checklist will be developeD. Which TWO questions from the list would you implement as part of the code review checklist? 3 credits [K3]

Number of correct answers: 2

Select all that apply, then click Submit answer.

  • Are any magic numbers (numeric literals) used, other than 0 or 1?

  • Can each item be implemented with the techniques, tools, and resources available?

  • Is it possible during acceptance testing to verify whether the item has been satisfied?

  • Is the item specified in an exact, unambiguous way?

  • Is there any logic containing no statements and no explanation as to why it is empty?

Question 3 (Testing of Software Characteristics)

It has been decided by management to ask an external consultant to perform a reliability assessment. The external consultant will use a checklist to support the assessment. Select TWO checklist items that are most likely to be part of a reliability checklist. 2 credits [K3]

Number of correct answers: 2

Select all that apply, then click Submit answer.

  • Are traceability matrices provided to the requirements?

  • Is all code supported by a reviewed design document?

  • Is the comment frequency at the correct level?

  • Is a dual set of hardware available?

  • Are features available for a periodic check of the database consistency?