ISEB-SWT2 ISTQB-BCS Certified Tester Foundation Level

Loading demo links...

Showing 10–12 of 15 questions

Question 10 (Topic 21, Mix Questions Set A)

Which of the following is the task of a Tester?

i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.

ii. Prepare and acquire Test Data

iii. Implement Tests on all test levels, execute and log the tests.

iv. Create the Test Specifications

Select an option, then click Submit answer.

  • i, ii, iii is true and iv is false

  • ii, iii, iv is true and i is false

  • i is true and ii, iii, iv are false

  • iii and iv is correct and i and ii are incorrect

Question 11 (Topic 23, Mix Questions Set C)

A garden irrigation system allows the user to specify 2 inputs:

1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day, maximum 5 times

2. Duration - The duration of operation, in whole minutes, each time it is switched on; ranging from 1 to 60

Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary values?

Select an option, then click Submit answer.

  • Frequency 1, 5; Duration 1, 60

  • Frequency 0, 1, 5, 6; Duration 59 seconds, 1 minute, 60 minutes, 60 minutes 1 second

  • Frequency 0, 1, 5, 6; Duration 0, 1, 30, 60, 61

  • Frequency 0, 1, 2, 5, 6; Duration 0, 1, 30, 60, 61

Question 12 (Topic 21, Mix Questions Set A)

The cost of fixing a fault:

Select an option, then click Submit answer.

  • Is not important

  • Increases as we move the product towards live use

  • Decreases as we move the product towards live use

  • Is more expensive if found in requirements than functional design

  • Can never be determined